Peer Reviewed Journal via three different mandatory reviewing processes, since 2006, and, from September 2020, a fourth mandatory peer-editing has been added.
Nowadays one of the most challenging tasks of producing companies is the growing complexity due to the globalization and digitalization. Especially in high wage countries, the ability to deliver fast and to a fixed date gets more and more important. To achieve this logistic targets, it is necessary to optimize the Production Planning and Control (hereinafter PPC).
In times of Cyber-Physical Systems and the horizontal and vertical connection of whole producing companies, the PPC has to deal with huge and real-time data. In the practice as well as in theoretical models there is a research deficit regarding to scheduling parameters (hereinafter SP). These parameters determine, for example, the planning frequency, planning length or planning resolution. A suitable setting of these parameters is indispensable in order to be able to process the data mentioned above.
This is why, this study investigates the effects of a change of the scheduling parameters on a target system. The focused research questions are: How can the effect of a scheduling parameters-variation on the target system of the PPC can be displayed efficiently? Is it possible to review the effect of the scheduling parameters-variation quantitatively and to derive action options?